城市轨道交通车站设备联动调试问题分析
张健
Analysis of Equipment Linkage Commission for Urban Rail Transit Station
ZHANG Jian
-
作者信息:上海申通轨道交通研究咨询有限公司,201103,上海
-
Affiliation:Shanghai Shentong Rail Transit Research and Consultancy Company, 201103, Shanghai, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2020.07.040
-
中图分类号/CLCN:U231.4;F530.7
-
栏目/Col:应用技术
摘要:
对合肥、上海、温州3条轨道交通线路综合联调过程中出现的车站设备问题,按照归属单位进行分类、统计及分析。从问题库中筛选出3个涉及消防的问题,并在技术上进行剖析研究。结合现场情况提出联调问题管理的3个侧重点。
Abstracts:
According to the station equipment troubles existing in the integrated linkage commission of three rail transit lines in Hefei, Shanghai and Wenzhou respectively, the problems are classified, counted and analyzed according to the units to which they belong. Then, three problems related to fire protection are selected from the database, detailed analysis and research are carried out in technology. Finally, three key points about the management of integrated linkage commission are put forward according to the site conditions.
引文 / Ref:
张健.城市轨道交通车站设备联动调试问题分析[J].城市轨道交通研究,2020,23(7):183.
ZHANG Jian.Analysis of Equipment Linkage Commission for Urban Rail Transit Station[J].Urban mass transit,2020,23(7):183.
ZHANG Jian.Analysis of Equipment Linkage Commission for Urban Rail Transit Station[J].Urban mass transit,2020,23(7):183.
- 上一篇: 市域轨道交通列控系统选型研究
- 下一篇: 金华—义乌—东阳市域轨道交通工程速度目标值选择分析