对合肥、上海、温州3条轨道交通线路综合联调过程中出现的车站设备问题,按照归属单位进行分类、统计及分析。从问题库中筛选出3个涉及消防的问题,并在技术上进行剖析研究。结合现场情况提出联调问题管理的3个侧重点。
Abstracts:
According to the station equipment troubles existing in the integrated linkage commission of three rail transit lines in Hefei, Shanghai and Wenzhou respectively, the problems are classified, counted and analyzed according to the units to which they belong. Then, three problems related to fire protection are selected from the database, detailed analysis and research are carried out in technology. Finally, three key points about the management of integrated linkage commission are put forward according to the site conditions.