归纳了城市轨道交通线路运营与筹备的主要工作,提出运营三权转移的关键因素、关键线路及工作时序。采用多目标决策模型,计算运营移交过程中各要素目标实现率最大的同时相应成本偏差最小的有效解,并通过城市轨道交通线路算例分析,进一步评估线路间运营移交的实际效果。
Abstracts:
The main works of urban rail transit operation and preparation are summarized. On this basis, the key factors, corresponding key routes and working schedules in the three rights transfer are put forward. By using the multiobjective decisionmaking model, the effective solution of the maximum realization rate for each objective and the minimum cost deviation in the process of operation handover are calculated. Through example analysis of urban rail transit routes, the actual effect of operation handover between lines is further evaluated.