城市轨道交通电力监控系统独立组网方案与集成方案的对比分析
郑聪1程畅2
Comparative Analysis of Independent Networking Scheme and Integration Scheme of Urban Rail Transit Power Supervision and Control System
ZHENG CongCHENG Chang
-
作者信息:1.宝信软件(成都)有限公司, 610093, 成都;
2.上海宝信软件股份有限公司, 201203, 上海
-
Affiliation:Baosight Software (Chengdu) Co., Ltd., 610093, Chengdu, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2022.07.050
-
中图分类号/CLCN:U231.8
-
栏目/Col:应用技术
摘要:
电力监控系统主要有独立组网方案、集成方案两种技术方案。针对哪种方案更符合未来智能城市轨道交通发展这一问题,对两种方案在数据流程、数据应用、建设成本、系统功能、运维要求等5个方面进行对比分析,得出结论如下:与独立组网方案相比,集成方案的系统稳定性更高,数据应用更全面,建设成本更低,也更符合智慧城市轨道交通建设的趋势。
Abstracts:
Power supervision and control system mainly includes two technical schemes: independent networking scheme and integration scheme. Aiming at the problem of which scheme being more in line with the development of smart urban rail transit in the future, the two schemes are compared and analyzed in five aspects: data flow path, data application, construction cost, system function and operation and maintenance requirements. Conclusions are as follows: compared to the independent networking scheme, the integrated scheme has higher system stability, more comprehensive data application and lower construction cost, and is more in line with the trend of smart urban rail transit construction.
引文 / Ref:
郑聪,程畅.城市轨道交通电力监控系统独立组网方案与集成方案的对比分析[J].城市轨道交通研究,2022,25(7):244.
ZHENG Cong,CHENG Chang.Comparative Analysis of Independent Networking Scheme and Integration Scheme of Urban Rail Transit Power Supervision and Control System[J].Urban mass transit,2022,25(7):244.
ZHENG Cong,CHENG Chang.Comparative Analysis of Independent Networking Scheme and Integration Scheme of Urban Rail Transit Power Supervision and Control System[J].Urban mass transit,2022,25(7):244.
- 上一篇: 城市轨道交通全自动运行列车跨控区回退安全防护设计方案
- 下一篇: -