上海市域铁路新建项目工程验收办法及安全评估方案研究
刘智平刘洋
Research on Engineering Acceptance Measures and Safety Evaluation Schemes of City Railway New Projects in Shanghai
LIU ZhipingLIU Yang
-
作者信息:中铁上海设计院集团有限公司, 200070, 上海
-
Affiliation:China Railway Shanghai Design Institute Group Co., Ltd., 200070, Shanghai, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2024.04.012
-
中图分类号/CLCN:U239.5
-
栏目/Col:研究报告
摘要:
[目的]上海市域铁路已有多个项目开工建设,但目前尚无明确的市域铁路新建项目工程验收办法及安全评估管理办法。为了对市域铁路新建项目工程验收、安全评估等管理办法的制定提供合理化建议,亟需开展市域铁路项目工程验收办法及安全评估方案的研究。[方法]从主要技术标准、建设及运营特点两方面,分析了市域铁路同地铁、国家铁路的差异。阐述了地铁、国家铁路建设项目工程验收及安全评估程序,讨论了二者在项目验收组织、验收程序及验收内容等方面的差异。在此基础上,针对上海市域铁路新建项目工程验收及安全评估的具体工作流程,提出了2个备选方案(方案一、方案二),并对2个方案进行了比选,提出适用于上海市域铁路新建项目验收及安全评估工作流程的建议方案。[结果及结论]上海市域铁路新建项目的工程验收及安全评估建议采用方案二,即上海市域铁路项目工程验收的程序及组织方式基本沿用地铁模式,并参照国家铁路项目的标准设置联调联试流程。
Abstracts:
[Objective] Several projects of city railway in Shanghai are currently under construction. However, there are no well-defined engineering acceptance and safety evaluation management measures for new city railway projects at the moment. To provide rational commentary on the formulation of management measures for new city railway project engineering acceptance and safety evaluation, it is urgent to conduct research regarding this aspect. [Method] From the perspectives of two main technical standards:construction and operation characteristics, the differences between city railway and metro/national railway are analyzed. The procedures for metro/national railway construction project engineering acceptance and safety assessment are expounded, and the differences in project acceptance organization, acceptance procedures, and acceptance content between the two are discussed. Based on this analysis, two alternative schemes are proposed for the specific workflow of Shanghai city railway new project engineering acceptance and safety evaluation (schemes I and II), and through comparative selection of the two schemes, the one suitable for the acceptance and safety evaluation workflow of new city railway projects in Shanghai is recommended. [Result & Conclusion] Scheme II is recommended for the engineering acceptance and safety evaluation of new city railway projects in Shanghai, the engineering acceptance procedures and organization modes of which generally follows the metro model, with reference to the standard procedures of national railway projects for joint testing and commissioning processes.