Key Technologies of Main Span 150 m Continuous Rigid Frame Bridge in Urban Rail Transit

  • Construction of bridges in prosperous urban areas is limited by construction site, interference of ground buildings and structures, and coordination of urban landscape. Taking the 150 m large-span continuous rigid frame bridge between Heshuikou Station and Shutianpu Station of Shenzhen Rail Transit Line 6 as the case, through comparative selection of bridge design scheme and technological application of BIM (building information modeling) and key component simulation, the design scheme of the large-span continuous Y-shaped rigid frame bridge, construction steps and quality control measures of key Y-shaped components are determined, so as to avoid the interference problems that might occur during the construction of large and complex bridges. It ensures the construction quality of 150 m large-span Y-shaped rigid frame bridge, reducing construction risk and improving the construction efficiency.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return