厦门地铁6号线一期工程车辆基地布局分析研究

刘增民

Research on the Vehicle Base Layout in the First Phase of Xiamen Metro Line 6

LIU Zengmin
  • 作者信息:
    中铁第一勘察设计院集团有限公司, 710043, 西安
  • Affiliation:
    China Railway First Survey and Design Institute Group Co., Ltd., 710043, Xi′an, China
  • 关键词:
  • Key words:
  • DOI:
    10.16037/j.1007-869x.2019.03.005
  • 中图分类号/CLCN:
    U279:U231
  • 栏目/Col:
    研究报告
摘要:
车辆基地的布局可对地铁运营成本产生直接影响,结合厦门地铁6号线一期工程中的车辆基地布局现状,提出调整优化方案。总结了车辆基地的合理布局,并提出了相应的建议,可为类似的车辆基地布局设计提供参考。
Abstracts:
The layout of the vehicle base directly affects the operating cost. Based on the layout status quo of the first phase vehicle base on Xiamen metro Line 6, an adjusting and optimizing scheme is put forward. Then, the rational vehicle base layout is summarized, corresponding suggestions are proposed to provide reference for vehicle base layout design.
引文 / Ref:
刘增民.厦门地铁6号线一期工程车辆基地布局分析研究[J].城市轨道交通研究,2019,22(3):19.
LIU Zengmin.Research on the Vehicle Base Layout in the First Phase of Xiamen Metro Line 6[J].Urban mass transit,2019,22(3):19.
论文检索