云南省保山市有轨电车T1线储能方案研究
蒲思培
Energy Storage Scheme of the Tram T1 Line in Baoshan City of Yunnan Province
PU Sipei
-
作者信息:中铁第四勘察设计院设备设计研究处,430063,武汉
-
Affiliation:China Railway Siyuan Survey and Design Group Co., Ltd., 430063, Wuhan, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2019.04.031
-
中图分类号/CLCN:TM910.6∶U482.1
-
栏目/Col:应用技术
摘要:
简要介绍了云南省保山市有轨电车T1线线路概况及对短编组储能式有轨电车的基本要求,介绍了参与方案竞选的三家主机厂储能式有轨电车基本储能方案,并对各厂家方案的仿真结果进行分析,为下一步保山有轨电车车辆选型工作作了铺垫。
Abstracts:
The general situation of the tramcar T1 Line in Baoshan City and the basic requirements for the short-group energy storage tram are briefly introduced. By comparing the major energy storage schemes of three biding manufacturer, the simulation result of each scheme is analyzed in detail, in order to lay a theoretical foundation for the tram selection of T1 Line in Baoshan City.
引文 / Ref:
蒲思培.云南省保山市有轨电车T1线储能方案研究[J].城市轨道交通研究,2019,22(4):125.
PU Sipei.Energy Storage Scheme of the Tram T1 Line in Baoshan City of Yunnan Province[J].Urban mass transit,2019,22(4):125.
PU Sipei.Energy Storage Scheme of the Tram T1 Line in Baoshan City of Yunnan Province[J].Urban mass transit,2019,22(4):125.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 加快建设上海轨道交通多层次线网的思考 毕湘利