富水卵石层地铁暗挖隧道拱顶塌方涌水处置技术
雷震
Gushing Water Treatment Technology for Mined Tunnel Vault Collapse in Water Rich Pebble Layer
LEI Zhen
-
作者信息:中交投资有限公司,100029,北京
-
Affiliation:CCCC Investment Co., Ltd.,100029, Beijing, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2020.06.027
-
中图分类号/CLCN:U457+2
-
栏目/Col:施工技术
摘要:
穿越富水、卵石等地层的地铁隧道地质水文情况复杂,施工难度大,易造成隧道拱顶塌方。这已成为地铁建设中的一大难题。以乌鲁木齐地铁4号线某区间暗挖隧道拱顶塌方事故为案例,提出了事故的综合治理措施。当隧道拱顶出现局部塌方时,可采取加固掌子面、增设拱顶超前小导管及径向锚管加固拱顶围岩等处置方案,达到塌方涌水处置目的。
Abstracts:
Due to the complex geological and hydrologic conditions in water rich pebble layer, the construction of metro tunnel crossing underground the area is very difficult. It is easy to cause tunnel vault collapse, which has become a major problem in metro construction. In the mined tunnel vault collapse of a section on Urumqi metro Line 4, comprehensive treatment measures are proposed. When a local collapse happens at the tunnel vault, the tunnel face should be reinforced, the leading small pipe of the arch and the radial anchor pipe be added to strengthen the wall rock of the arch, so as to stop water gushing from the vault collapse.
引文 / Ref:
雷震.富水卵石层地铁暗挖隧道拱顶塌方涌水处置技术[J].城市轨道交通研究,2020,23(6):116.
LEI Zhen.Gushing Water Treatment Technology for Mined Tunnel Vault Collapse in Water Rich Pebble Layer[J].Urban mass transit,2020,23(6):116.
LEI Zhen.Gushing Water Treatment Technology for Mined Tunnel Vault Collapse in Water Rich Pebble Layer[J].Urban mass transit,2020,23(6):116.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 地铁设施不动产三维空间权利范围及确权方法