基于一种典型站型的折返方案及折返能力提升研究

张雅

Research on Turn-back Scheme and Capacity Improvement Based on Typical Station

ZHANG Ya
摘要:
针对城市轨道交通运营过程中运能需求与运量不匹配的问题,为了满足高密度的行车组织需求,缓解运营压力,研究一种在不改变原有土建配线,以及信号系统安全防护、闭塞设计等条件下,通过调整列车在折返站的可控作业时间,灵活组合接发车顺序,进而提升线路运能的方案。以上海轨道交通某站型为例,进行分析研究,并给出了行车组织建议。
Abstracts:
In view of the problem of mismatch between the transportation capacity demand and the transportation volume in the operation of urban rail transit, to meet the demand of high-density traffic organization, to relieve the operation pressure, a line capacity improvement scheme is studied, which is a flexible combination of receiving and departure sequence by adjusting the controllable operation time of the train at the turn-back station, without changing the original civil wiring, as well as the safety protection and block design of the signal system. Taking a typical station of Shanghai rail transit as an example, analysis and study are conducted, and further suggestions on traffic organization are delivered.