钢轨轨底坡对下部授流接触轨安装的影响
刘柏林张维
Influence of Rail Cant on the Installation of Lower Contact Rail
LIU BolinZHANG Wei
-
作者信息:北京城建设计发展集团股份有限公司武汉分公司,430062,武汉
-
Affiliation:Wuhan Branch Company of Beijing Urban Construction Design & Development Group Co.,Ltd.,430062, Wuhan, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2021.01.029
-
中图分类号/CLCN:TM922.6
-
栏目/Col:施工技术
摘要:
接触轨是第三轨授电的地铁牵引供电系统的重要组成部分,接触轨的正确安装是车辆安全受电的前提。 针对安装于加长短轨枕上的下部授流接触轨安装形式,建立几何模型推导出接触轨安装位置与钢轨轨底坡之间的数学关系式,给出接触轨正确安装时允许钢轨轨底坡安装误差范围的计算方法,以及两种常见安装参数下接触轨正确安装可接受的钢轨轨底坡范围值。 最后,针对钢轨轨底坡超出接触轨安装允许范围而无法安装的情况,给出了补救建议。
Abstracts:
Contact rail system is an important component of third rail metro traction power supply system. The correct installation of contact rail is the premise of safe vehicle electrification. For the lower contact rail installation on the longer sleeper,mathematical relationship between installation position of contact rail and rail cant is derived. The calculation method of allowable rail cant displacement when contact rail is correctly installed is given,and the allowable rail cant range under two common installation parameters range is listed. In the end,remedial suggestions are given for the installation failure situation where the rail cant is beyond the allowable installation range of the contact rail.
引文 / Ref:
刘柏林,张维.钢轨轨底坡对下部授流接触轨安装的影响[J].城市轨道交通研究,2021,24(1):139.
LIU Bolin,ZHANG Wei.Influence of Rail Cant on the Installation of Lower Contact Rail[J].Urban mass transit,2021,24(1):139.
LIU Bolin,ZHANG Wei.Influence of Rail Cant on the Installation of Lower Contact Rail[J].Urban mass transit,2021,24(1):139.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 地铁设施不动产三维空间权利范围及确权方法