地铁运营初期部分机电设备精细化运行时间表制定策略
宋吉鹏
Strategy for Formulating Refined Operation Schedule of Certain Mechanical and Electrical Equipment at Metro Operation Initial Stage
SONG Jipeng
-
作者信息:青岛地铁集团有限公司运营分公司,266100,青岛
-
Affiliation:Operation Branch of Qingdao Metro Group Co., Ltd., 266100, Qingdao, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2021.09.033
-
中图分类号/CLCN:U291.1+2
-
栏目/Col:研究报告
摘要:
地铁机电设备运行时间表是调度员利用自动控制系统对地铁通风空调系统、照明系统等机电设备进行定时控制的重要工具。以青岛地铁2号线为例,针对地铁运营初期的实际情况,根据列车运营时刻表对各站首末班车时间进行了梳理划分;并通过查阅相关机电设备参数、车站和隧道空间参数等,对一次通风时间进行了相关计算;再综合地铁首末班车时间和相关环境条件等因素,详细阐述了地铁照明系统、车站大系统及隧道通风系统的精细化运行时间表制定策略。实际应用表明,精细化运行时间表具有较好的节能效果。
Abstracts:
The operation schedule of metro mechanical and electrical equipment is an important tool for the dispatcher to time control the ventilation and air conditioning system and lighting system with the automatic control system. Taking Qingdao Metro Line 2 as an example, in view of the actual situation of metro operation at initial stage, the first and last metro time of each station according to the train timetable are sorted, and the time of one ventilation is calculated by consulting relevant mechanical and electrical equipment parameters, station and tunnel space parameters. The strategy for formulating refined operation schedule of metro lighting system, ventilation and air conditioning system are expounded in detailed considering factors such as the first and last metro time and relevant environmental conditions. Actual implementation shows that the refined operation schedule has better energy saving effect.
引文 / Ref:
宋吉鹏.地铁运营初期部分机电设备精细化运行时间表制定策略[J].城市轨道交通研究,2021,24(9):159.
SONG Jipeng.Strategy for formulating refined operation schedule of certain mechanical and electrical equipment at metro operation initial stage[J].Urban Mass Transit,2021,24(9):159.
SONG Jipeng.Strategy for formulating refined operation schedule of certain mechanical and electrical equipment at metro operation initial stage[J].Urban Mass Transit,2021,24(9):159.