地铁车辆段上盖物业开发各阶段主要问题研究
付敏
Study on the Main Problems at Each Stage of Metro Vehicle Depot Overhead Property Development
FU Min
-
作者信息:中铁四院集团西南勘察设计有限公司, 650206, 昆明
-
Affiliation:China Railway Siyuan Group Southwest Survey and Design Co., Ltd., 650206, Kunming, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2022.04.035
-
中图分类号/CLCN:F293.2;TU984.11+.3
-
栏目/Col:应用技术
摘要:
总结并分析了国内主要城市的地铁车辆段上盖物业开发现状及面临的问题,结合昆明市地铁5号线世博车辆段上盖物业开发项目的实际情况,针对项目规划、设计、建设和运营等阶段提出建议,以期为昆明市地铁车辆段上盖物业开发项目提供参考。
Abstracts:
Metro vehicle depot overhead property development has great potential in China. By summarizing the development status and existing problems of vehicle depot overhead property in domestic major cities, considering the practical situation of World Expo depot preparing for overhead property development of Kunming Metro Line 5, suggestions are given from the perspective of planning, design, construction and operation, providing reference for Kunming Metro vehicle depot overhead property development projects.
引文 / Ref:
付敏. 地铁车辆段上盖物业开发各阶段主要问题研究. 城市轨道交通研究, 2022, 25(4): 165.
FU Min. Study on the main problems at each stage of metro vehicle depot overhead property development. Urban Mass Transit, 2022, 25(4): 165.
FU Min. Study on the main problems at each stage of metro vehicle depot overhead property development. Urban Mass Transit, 2022, 25(4): 165.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 城市轨道交通运营安全的第三方评估