双层大断面顶管法在上海轨道交通14号线静安寺站施工中的应用
刘洪波1周顺华2吴迪1
Application of Double Layer Large Section Pipe Jacking Method at Jing′an Temple Station of Shanghai Rail Transit Line 14
LIU HongboZHOU ShunhuaWU Di
-
作者信息:1.上海申通地铁集团有限公司技术中心, 201103, 上海;
2.同济大学交通运输工程学院, 201804, 上海
-
Affiliation:Technical Center of Shanghai Shentong Metro Group Co., Ltd., 201103, Shanghai, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2022.06.030
-
中图分类号/CLCN:U231+.4; U455.47
-
栏目/Col:施工技术
摘要:
针对上海轨道交通14号线静安寺站顶管工程的特点和难点,针对性地提出了复合管节设计、防水设计、抗震设计、管节耐久性施工、顶管装备研发、顶管近距离施工及环境影响控制等设计和施工关键技术,有效解决了14号线静安寺站顶管施工难题。
Abstracts:
According to the characteristics and difficulties of the pipe jacking project of Jing′an Temple Station of Shanghai Rail Transit Line 14, key design and construction technologies such as composite pipe joint design, waterproof design, seismic design, pipe joint durability construction, pipe jacking equipment research and development, pipe jacking close-distance construction and environmental impact control are put forward, which effectively solves the pipe jacking construction problems of Jing′an Temple Station of Line 14.
引文 / Ref:
刘洪波, 周顺华, 吴迪. 双层大断面顶管法在上海轨道交通14号线静安寺站施工中的应用. 城市轨道交通研究, 2022, 25(6): 159.
LIU Hongbo, ZHOU Shunhua, WU Di. Application of double layer large section pipe jacking method at Jing′an Temple station of Shanghai rail transit line 14. Urban Mass Transit, 2022, 25(6): 159.
LIU Hongbo, ZHOU Shunhua, WU Di. Application of double layer large section pipe jacking method at Jing′an Temple station of Shanghai rail transit line 14. Urban Mass Transit, 2022, 25(6): 159.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 强力推进智慧城市轨道交通建设