以上海某轨道交通FAO(全自动运行)线路车站风水联动调试为案例,对其调试思路进行了探索,梳理出调试过程中的相关设备。将风水联动调试划分为4个主要阶段,深入总结每个阶段调试过程中的问题并提出解决方案。对建设管理方、设计单位、运营方、集成商提出了风水联动调试的合理化建议。
Abstracts:
Taking the wind-water joint commissioning of a FAO (fully automatic operation) rail transit line station in Shanghai as study case, the commissioning ideas are explored and the relevant equipment in the commissioning process are sorted. The wind-water joint commissioning is divided into four main stages, and the problems in the commissioning process of each stage are summarized in depth and solutions are proposed. Reasonable suggestions are put forward to construction management, design unit, operator and integrator about the wind-water joint commissioning.