北京轨道交通互联互通灵活编组的车辆试验验证方案
宋占勋1方少轩2饶东3赵川宇3
Test and Verification Scheme for Interconnected/Intercommunicated Flexible Formation Vehicles in Beijing Rail Transit
SONG Zhanxun1FANG Shaoxuan2RAO Dong3ZHAO Chuanyu3
-
作者信息:1.北京城市轨道交通咨询有限公司, 100068, 北京
2.中国城市轨道交通协会, 100055, 北京
3.北京市轨道交通建设管理有限公司, 100068, 北京
-
Affiliation:1.Beijing Urban Rail Transit Consulting Co., Ltd., 100068, Beijing, China
2.China Association of Metros, 100055, Beijing, China
3.Beijing MTR Construction Administration Co., Ltd., 100068, Beijing, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2025.04.019
-
中图分类号/CLCN:U270.6+7
-
栏目/Col:研究报告
摘要:
[目的]为了在互联互通线路条件下实现列车的灵活编组功能,提出一套系统性的车辆试验验证方案。[方法]以北京地铁3号线、12号线互联互通、灵活编组为背景,基于列车的机械接口、电气接口和通信接口设计,针对列车联挂/解钩、重联运行、互联互通运行3个场景,从兼容性及调度需求出发,提出一整套试验验证方案,详细阐述论证了各项关键系统、试验项点的验证内容及必要性,并增加了型式试验内容。[结果及结论]针对车辆联挂/解钩场景,提出车钩、TCMS(列车控制及管理系统)、车载PIS(乘客信息系统)的试验验证;针对重联运行场景,对牵引、制动两个系统进行了试验验证;在互联互通运行场景中,针对车辆轮廓、外部接口相关的供电、信号、通信和站台门等4个专业设备进行了兼容性、联动试验验证。
Abstracts:
[Objective] In order to achieve flexible train formation function under the conditions of interconnected lines, a systematic vehicle test and verification scheme is proposed. [Method] Taken the interconnection and flexible formation of Beijing Metro Line 3 and Line 12 as the background, based on the design of the vehicle′s mechanical interface, electrical interface, and communication interface, aiming at three scenarios of vehicle coupling/uncoupling, reconnection operation, and interconnection/intercommunication operation, considering compatibility and scheduling requirements, a complete set of test and verification schemes are proposed, which elaborates and demonstrates in detail the verification content and necessity of various key systems and test items, and adds type test content. [Result & Conclusion] For the vehicle coupling/uncoupling scenario, a test verification of the coupler, TCMS (train control and management system) and on-board PIS (passenger information system) is proposed; for the reconnection operation scenario, a test verification is carried out on the traction and braking systems; in the interconnection/intercommunication operation scenario, the compatibility and linkage test verifications are carried out on the four equipment professionals of power supply, signal, communication and platform door related to the vehicle contour and external interface.