城市轨道交通全自动运行线路同站台换乘 无线干扰解决方案
邹定锋
Solution to Sameplatform Interchange Wireless Interference of Urban Rail Transit FAO Line
ZOU Dingfeng
-
作者信息:福州地铁集团有限公司, 350001, 福州
-
Affiliation:Fuzhou Metro Group Co., Ltd., 350001, Fuzhou, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2023.02.008
-
中图分类号/CLCN:U231.7
-
栏目/Col:研究报告
摘要:
为了解决18 GB专用频段对城市轨道交通两线换乘区域的LTE(长期演进)干扰问题,以福州轨道交通4号线GOA4(无人干预列车运行)级FAO(全自动运行)线路与5号线GOA2(半自动化列车运行)级线路的换乘站(浦口站)为例,通过TD(时分)LTE技术分析与实地测试,对两线换乘区域的LTE抗干扰设计与18 GB频段规划进行了深入研究,形成了4号线、5号线换乘区域LTE抗干扰解决方案,为福州后续城市轨道交通线路类似问题的解决提供参考。
Abstracts:
To solve the LTE (long-term evolution) interference problem in the two-line interchange area of urban rail transit with 1.8 GB dedicated frequency band, the interchange station (Pukou Station) of Fuzhou Rail Transit Line 4 GOA4 (unattended train operation) grade FAO (fully automatic operation) line and Fuzhou Rail Transit Line 5 GOA2 (semi-automatic train operation) grade FAO line is taken as an example, and the LTE anti-interference design and 1.8 GB frequency band planning of the two-line interchange area are studied in depth through the analysis and field test of TD (time division)-LTE technology. The LTE anti-interference solution of the interchange area of Line 4 and Line 5 is formed, providing a reference for the solution of similar problems of the subsequent rail transit lines in Fuzhou.