Abstract:
It has higher requirements for seamless transfer and integrated space design between urban rail transit station, large urban comprehensive transport hub and commercial areas. Based on the investigation and analysis of pedestrian behavior characteristics in Urumqi City, and taking the transfer station of Urumqi rail transit Line 2 and Line 4 as a case, the connection between metro station and high-speed railway station, the space layout of ground layer, hall layer, platform layer and commercial area, the transfer mode and emergency evacuation plan are simulated and optimized. On this basis, a method for optimizing the integrated layout of urban rail transit station is put forward.