Abstract:
By analyzing the high reliability requirements for the passenger transport of Shanghai Pudong International Airport MRT (mass rapid transit) Line, a customized technical division scheme of special interlocking control area is designed. Based on the typical signal equipment failures, the influence of the technical scheme on the reliability and availability of MRT Line is assessed. This scheme can provide a practical case reference for the construction of related airport MRT system both in China and abroad.