列车速度受限区间的接触网悬挂及隧道断面技术方案

Technical Scheme of Overhead Catenary System and Tunnel Section in Train Speed Limited Interval

  • 摘要: 市域快轨交通线路下穿中心城区时,因车站密度较大会导致列车运行速度受限,进而影响区间接触网悬挂及隧道断面的技术方案。成都轨道交通13号线一期工程地下段列车限速100 km/h,在接触网悬挂方式及空气动力效应研究的基础上,通过对隧道工程、盾构机购置和接触网工程进行综合经济技术比较,确定采用140 km/h盾构隧道断面和刚性悬挂、柔性悬挂兼容方案。该方案与采用100 km/h盾构隧道断面和刚性悬挂方案相比,在投资上处于同一水平,在技术上较有优势。该方案管片外径为8 300 mm,在盾构施工和预制管片等方面可与在建的成都轨道交通17、18号线统筹兼顾。该方案目前已纳入成都轨道交通13号线一期工程初步设计,用于指导工程实施。

     

    Abstract: When an urban rail rapid transit line undergoes downtown,train speed is limited due to the high density of stations,and technical scheme of Overhead Catenary System(OCS)and tunnel section is furthermore influenced. Since the underground interval of the first phase project of Chengdu Metro Line 13 has a speed limit of 100 km/h,considering the OCS and aerodynamic effect study,comprehensive economic and technical comparison among tunnel engineering,shield machine purchase and catenary engineering is conducted,and 140 km/h shield tunnel section and integral rigid and flexible suspension are adopted. Compared to the scheme that adopts 100 km/h shield tunnel section and rigid suspension, this scheme requires same level of investment while possesses technical advantages. The shield lining segment outer diameter in this scheme is 8300 mm,compatible with both Chengdu Metro Line 17 and 18 in the aspects of shield construction and precast segment. The scheme has been adopted in the preliminary design of Chengdu Metro Line 13 first phase project for guidance of engineering implementation.

     

/

返回文章
返回