地铁车辆基地综合自动化管理系统收发车计划编制及动态调整方案

Formulation and Dynamic Adjustment of Vehicle Receiving and Dispatching Plan of Metro Vehicle Base Integrated Automation Management System

  • 摘要: 地铁车辆基地的线路场段规模直接影响收发车计划的编制,而收发车计划的编制又直接影响收发车作业的数量和效率,进而影响地铁运营成本,甚至行车安全。科学编制车辆基地收发车计划对保证场段作业安全,降低地铁运营成本有着现实意义。在分析车辆基地工作场景的基础上,对车辆基地综合自动化管理系统的收发车计划编制及动态调整方案进行研究。结果显示,收发车计划编制动态调整后,提高了场段股道、列车、人力等资源利用率,提高了车辆基地作业管理自动化水平,有效降低了车辆基地生产运营成本。

     

    Abstract: Line scale in metro vehicle base directly affects the vehicle receiving and dispatching plan formulation,which in turn directly affects the quantity and efficiency of vehicle receiving and dispatching operations,thus the metro operation cost and even operational safety are concerned. Therefore,it is of practical significance to scientifically formulate the vehicle base receiving and dispatching plan to ensure field operational safety and reduce metro operation cost. On the basis of analyzing the operation scenarios in vehicle base, the formulation and dynamic adjustment scheme of vehicle receiving and dispatching plan of the vehicle base integrated automation management system are studied. Results show that after the dynamic adjustment,the utilization rate of resources such as track,train and manpower,and the automation level of operation management of the vehicle base are improved,and the production and operation costs of the vehicle base are effectively reduced.

     

/

返回文章
返回