青岛地铁5号线镇平路车辆段用地资源受限下双向接轨方案研究

Zhenpinglu Depot Two-way Connection Scheme of Qingdao Metro Line 5 under Limited Land Resources

  • 摘要: 以青岛地铁5号线镇平路车辆段为例,在段场用地受到多处建(构)筑物限制下,经车辆段出入线功能需求分析,提出多种具备双向收发车功能的出入线接轨方案,采用加权评价法对各接轨方案进行定量分析,最终确定出能够减少列车空驶距离、降低运营成本,同时能兼顾车辆段上盖物业开发需求的接轨方案。

     

    Abstract: Taking Zhenpinglu Depot of Qingdao metro Line 5 as an example, the site of which is restricted by multiple structures and buildings, a variety of two-way line connection schemes with receiving and departure functions are proposed based on an analysis of the functional requirements of the depot entrance and exit lines. Then, through quantitative analysis of each connection scheme by using the weighted evaluation method, a connection scheme that can reduce the train empty driving distance and the operation cost is finally determined, it can also take into account the needs of property development above the depot.

     

/

返回文章
返回