超近距离交叠地铁隧道施工相互扰动规律及控制措施

Mutual Disturbance Patterns and Control Measures for the Construction of Ultra-Close Overlapping Metro Tunnels

  • 摘要:
    目的 超近距离交叠地铁隧道进行穿越施工时,由于隧道间净距小,极易引起隧道产生不均匀沉降变形,因此有必要研究超近距离交叠地铁隧道施工的相互扰动规律及相关控制措施。
    方法 以重庆轨道交通27号线广福大道站—重庆东站区间下穿重庆轨道交通6号线东延伸交叠段工程为例,通过对其进行全过程的施工开挖模拟,分析隧道间的施工相互影响规律及变形特征,并基于此选取隧道间净距最小段作为研究对象,研究最优注浆加固措施,并应用于实际工程项目。
    结果及结论 隧道下穿结束后,既有隧道沉降变形随着交叠隧道间净距的减小而增大;隧道上下穿施工结束后,隧道间竖向位移产生交互叠加效应。采用盾构管片壁后注浆加固措施后,暗挖隧道与盾构隧道沉降值均获得了有效控制,重庆轨道交通27号线和6号线的管片拱顶沉降值分别降低了37.7 %和56.0 %。现场监测数据分析结果表明,采用合理的施工控制措施后,隧道结构的整体变形均获得了有效控制,能够保证隧道的结构安全性。

     

    Abstract:
    Objective During the construction of ultra-close overlapping metro tunnels, the small clearance between tunnels often leads to uneven settlement deformation. Therefore, it is necessary to investigate the mutual disturbance patterns and relevant control measures for the construction of such tunnels.
    Method Taking the project of the overlapping section from Guangfudadao Station to Chongqing East Station of Chongqing Metro Line 27 under-passing the East Extension of Chongqing Metro Line 6 as a case study, the full-process construction excavation is simulated. The mutual influence patterns during construction and the deformation characteristics between the tunnels are analyzed. Based on this, a section with the minimum clearance between the tunnels is selected as the research object to study the optimal grouting reinforcement measures, which are then applied to the actual engineering project.
    Result & Conclusion After the under-passing construction is completed, the settlement deformation of the existing tunnel increases with the decrease of the clearance between the overlapping tunnels. After the over-passing and under-passing constructions, an interactive superposition effect occurs on vertical displacement between the tunnels. After implementing the segment backfill grouting reinforcement measure for the shield tunnel, the settlement values of both the mined tunnel and the shield tunnel are effectively controlled. The vault settlement values of the segments for Chongqing Metro Line 27 and Line 6 are reduced by 37.7% and 56.0%, respectively. Analysis results of the on-site monitoring data show that after implementing reasonable construction control measures, the overall deformation of the tunnel structures is effectively controlled, ensuring the structural safety of the tunnels.

     

/