  • 摘要:
    目的 上海轨道交通2号线(以下简称“2号线”)建设时期采用TBTC(基于轨道电路的列车控制)信号模式,线路进入信号大修改造年限后,信号系统升级为“TBTC+CBTC(基于通信的列车控制)”。由于既有站台门系统不能与信号系统联动,需要对站台门进行改造。
    方法 介绍了2号线站台门改造前的基本情况。根据站台门是否为全高站台门,将该线站台门改造工程分为4个区段。比选后采用了“即拆、即安装、即调试使用”的改造方案,介绍了改造前的相关筹备工作。阐述了不同区段站台门门体改造、站台门控制系统改造的实施情况,并对改造后站台门的能力提升进行了总结。
    结果及结论 “即拆、即安装、即调试使用”方案未对日常运营造成影响,保证了改造期间正常的列车运行及乘客乘降。全线改造完成后,线路列车具备了DTO(有人值守的列车自动运行)功能,以及站台门与列车门精准联动、自动开关门等功能。

     

    Abstract:
    Objective Shanghai Rail Transit Line 2 (hereinafter referred to as 'Line 2') adopts TBTC (track circuit-based train control) signaling mode during its construction period. After the line entered the stage for major signaling system overhaul, the signaling system is upgraded to 'TBTC+CBTC (communication-based train control)' mode. As the existing platform screen door system could not be linked with the signaling system, it is necessary to carry out a retrofit of the platform screen doors.
    Method The basic conditions of the platform screen doors on Line 2 prior to retrofit are introduced. According to whether the platform screen doors are full-height platform screen doors, the retrofit project for the line is divided into four sections. After comparison, the retrofit scheme of 'immediate dismantling, immediate installation, and immediate commissioning for use' is adopted, and the preparatory work prior to retrofit is described. The implementation of door structure retrofit and control system retrofit for platform screen doors in different sections is elaborated, and the improvement in platform screen door capacity after the retrofit is summarized.
    Result & Conclusion  The 'immediate dismantling, immediate installation, and immediate commissioning for use' scheme did not affect daily operations, ensuring normal train operation and passenger boarding/alighting during the retrofit period. After the completion of the retrofit along the entire line, trains on the line are equipped with DTO (driverless train operation with staff on board) functionality, other functions such as precise coordination between platform screen doors and train doors, as well as automatic door opening and closing are also realized.

     

/