嘉兴至枫南市域铁路嘉兴城区段敷设方式研究

Alignment Method for Jiaxing Urban Section of Jiaxing-Fengnan Suburban Railway

  • 摘要:
    目的 嘉兴至枫南市域铁路是嘉兴市域铁路网东西向骨干线路,途径嘉兴市主城区,沿线建构筑物密集,控制点多,其敷设方式对国土空间规划和周边地块开发建设影响重大,需进行深入研究。
    方法 结合嘉兴城区段的工程地质特点、市域铁路城区段敷设原则、周边主要控制因素,从工程实施条件、城市环境、沿线土地综合开发、线网换乘等多个维度,对短隧道方案与全隧道方案开展了系统性比选研究。
    结果及结论 城区段全隧道敷设方案虽然工程投资相对较高,但该方案能最大限度地满足国土空间规划、减少对地面交通干扰、有效控制列车运行噪声对周边环境的影响,可为雀墓桥遗址等重要文化遗产提供更可靠的保护。

     

    Abstract:
    Objective The Jiaxing–Fengnan City Railway is an east-west backbone line of Jiaxing city railway network, passing through Jiaxing city main urban area, with dense buildings along the corridor and many control points. The alignment method has a significant impact on national spatial planning and surrounding land development quality, thus requiring in-depth study.
    Method Considering the engineering stratigraphical characteristics of Jiaxing urban section, alignment principles for city railways in urban sections, and the main controlling factors for surrounding area, a systematic comparative study between the short-tunnel and full-tunnel schemes is conducted from multiple dimensions, including construction conditions, urban environment, integrated land development along the route, and network transfers.
    Result & Conclusion  Although the full-tunnel alignment scheme involves higher capital investment, it maximizes the degree of meeting national spatial planning requirements, lowering interference with ground traffic, effectively controlling impact of train operation noise on surrounding environment, and provide more reliable protection for important cultural heritage sites such as Quemuqiao Relics.

     

/

返回文章
返回