芜湖市轨道交通1、2号线工程机电设备系统建设管理
黄坤林
Construction and Management of Mechanical and Electrical Equipment for Wuhu Rail Transit Line 1 and Line 2 Projects
HUANG Kunlin
-
作者信息:芜湖市运达轨道交通建设运营有限公司,241006,芜湖
-
Affiliation:Wuhu Yunda Rail Transit Construction and Operation Co. Ltd., 241006, Wuhu, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2019.10.004
-
中图分类号/CLCN:U251.1;U232
-
栏目/Col:百家论坛
摘要:
芜湖市轨道交通1、2号线工程是国内首个采用PBTS跨坐式单轨车辆及全自动运行建设标准的城市轨道交通项目,可供借鉴的经验较少。结合芜湖这2条线路机电设备系统建设管理的特点,对现有标准适用性、全自动运营场景研究、接口管理、关键技术国产化等方面进行了介绍。
Abstracts:
Wuhu Rail Transit Line 1 and Line 2 are the first urban rail transit projects in China that adopts the PBTS straddle monorail vehicle and fully automatic operation construction standards, with less experience for reference. Focusing on the construction and management characteristics of mechanical and electrical equipment system on the two lines, the applicability of existing standards, research on the fully automatic operation scenario, interface management and localization of key technologies are introduced.