工业工程方法在电力机车线槽布线中的应用

贺金英1王睿哲2

Application of Industrial Engineering Method in the Wiring of Electric Locomotive Trunking

HE JinyingWANG Ruizhe
摘要:
采用工业工程、人因工程等方法,分析了电力机车中央线槽预布线的作业顺序、作业时间、移动距离、作业区域布置与员工移动路径等问题,对中央线槽预布线的工艺流程、工艺方法进行了优化。研究结果可以为提高员工作业效率和改善员工作业环境的技术改造与提升提供参考。
Abstracts:
Using the methods of industrial engineering and human factors engineering,the operation process,operation period,moving distance,work area layout and employee movement path are analyzed,the operation process and methods for electric locomotive central trunk pre-laying are optimized. The research will provide reference for the improvement of work efficiency and working environment,as well as for the employees and the technological transformation and upgrading.
引文 / Ref:
贺金英,王睿哲.工业工程方法在电力机车线槽布线中的应用[J].城市轨道交通研究,2020,23(4):108.
HE Jinying,WANG Ruizhe.Application of Industrial Engineering Method in the Wiring of Electric Locomotive Trunking[J].Urban mass transit,2020,23(4):108.