上海浦东国际机场捷运线站台门控制系统的设计和实现
李永乐
Design and Implementation of the Platform Screen Door Control System for Pudong International Airport MRT Line
LI Yongle
-
作者信息:上海申通地铁集团有限公司,200063,上海
-
Affiliation:Shanghai Shentong Metro Co., Ltd., 200063, Shanghai, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2020.10.043
-
中图分类号/CLCN:U231.4;U291.6+3
-
栏目/Col:其他
摘要:
基于上海浦东国际机场捷运线车站站台门的工程条件和特殊运营需求,常规站台门控制系统功能不能满足其运营组织需求。通过对捷运线特殊运营组织需求进行分析,从解决思路、设计和实施方案、功能配置等方面进行研究,最终方案为在常规站台门控制系统上增加“防混流”和“回流”控制功能。浦东国际机场捷运线开通至今,站台门控制系统功能运行安全、可靠,旅客疏导合理。
Abstracts:
Due to the engineering conditions and special operation requirements of Pudong International Airport MRT (mass rapid transit) Line, the functions of standard platform screen door control system cannot meet the operation and organization needs of the MRT Line. Through analyzing the specific operation and organization needs of MRT Line, this problem is studied from the perspective of solutions, design and implementation plans, functional configurations and more. As a result, the final scheme is to add “mix-flow control” and “back-flow” functions to the standard platform screen door control system. Since the opening of Pudong International Airport MRT Line, the platform screen door control system has been performing safely and reliably with reasonable passenger guidance.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 新型冠状病毒肺炎疫情对上海轨道交通客流的影响及防控措施分析*