深圳地铁5号线信号系统的基线升级

龙竞航

Baseline Upgrading of Shenzhen Metro Line 5 Signaling System

LONG Jinghang
  • 作者信息:
    1.1.上海轨道交通无人驾驶列控系统工程技术研究中心,200071,上海;
    2.2.卡斯柯信号有限公司,200071,上海
  • Affiliation:
    Shanghai Engineering Research Center of Driverless Train Control of Urban Guided Transport, 200071, Shanghai, China
  • 关键词:
  • Key words:
  • DOI:
    10.16037/j.1007-869x.2021.04.029
  • 中图分类号/CLCN:
    U231.7
  • 栏目/Col:
    应用技术
摘要:
介绍了深圳地铁5号线信号系统基线升级的基本情况。详细阐述了列车自动控制子系统、计算机联锁子系统、自动列车监控子系统、维护支持子系统及数据通信子系统功能升级优化的特点。结合深圳地铁5号线信号系统基线升级作业情况,总结了基线升级时遇到的常见问题以及相应的处理办法。
Abstracts:
The baseline upgrading situation of Shenzhen Metro Line 5 signaling system is introduced. The upgrading and optimization features of automatic train control (ATC) sub\|system, computer\|based interlocking (CBI) sub\|system, automatic train supervision (ATS) sub\|system, maintenance support system (MSS) sub\|system and data communication system (DCS) sub\|system are expounded. By referring to the baseline upgrading experience of Shenzhen Metro Line 5 signaling system, the commonly encountered situation and corresponding treatment measures during baseline upgrading are summarized.
引文 / Ref:
龙竞航.深圳地铁5号线信号系统的基线升级[J].城市轨道交通研究,2021,24(4):115.
LONG Jinghang.Baseline Upgrading of Shenzhen Metro Line 5 Signaling System[J].Urban mass transit,2021,24(4):115.
论文检索