城市轨道交通车站机电设备联调策略分析
谭玉良
Analysis of Joint Debugging Strategy for Urban Rail Transit Station Electromechanical Equipment
TAN Yuliang
-
作者信息:上海申通轨道交通研究咨询有限公司, 201103, 上海
-
Affiliation:Shanghai Shentong Rail Transit Research and Consultancy Company, 201103, Shanghai, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2022.10.040
-
中图分类号/CLCN:U291.12; U231
-
栏目/Col:施工技术
摘要:
结合上海、合肥、徐州等城市轨道交通联调项目经验,针对车站机电设备调试的特点和难点,总结出车站机电设备联调策略,并对城市轨道交通初期运营前安全评估涉及车站机电设备的测试科目进行了梳理。结合工期和初期运营前安全评估经验,制定出“三步走”的车站机电设备联调策略。
Abstracts:
Combined with the experiences of urban rail transit joint debugging projects in Shanghai, Hefei, Xuzhou and other cities, targeting the characteristics and difficulties of station electromechanical equipment debugging, the joint debugging strategy of station electromechanical equipment is summarized. The test items of station electromechanical equipment related to urban rail transit primary operation safety assessment are sorted. Combined with the safety assessment experience before construction period and primary operation, a ′three-step′ station electromechanical joint debugging strategy is formulated.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 深圳都市圈城际铁路CBTC系统功能需求研究