盖挖逆作法施工地铁车站叠合墙综合防水体系

雷涛1漆继良1施成华2孙晓贺2

Comprehensive Waterproof System for Composite Walls in Metro Station Constructed by Coverexcavation Reverse Method

LEI TaoQI JiliangSHI ChenghuaSUN Xiaohe
摘要:
盖挖逆作法施工地铁车站叠合墙中无法铺设柔性防水层,一旦发生渗漏水不仅影响结构耐久性,同时也会增加后期封堵费用,因此叠合墙结构防水是地铁车站工程施工的重点和难点,需进行针对性研究。方法:分析了叠合墙的地下连续墙、内衬墙及其他关键位置发生渗漏水的原因;以长沙地铁6号线朝阳村站工程为依托,介绍了叠合墙综合防水体系的多道防水技术,包括围护结构防水、防水涂料防水、渗漏点预处理、内衬墙防水和预埋注浆管防水;介绍了各道防水技术实施过程中所采用的新技术和新装置,并提出了相应的保障措施和注意事项。结果及结论:长沙地铁6号线朝阳村站自工程完工后的3年使用期间未发生渗漏水现象,表明所提出的叠合墙综合防水体系防水效果良好。
Abstracts:
Flexible waterproof layers cannot be installed in composite walls of metro stations constructed by coverexcavation reverse method, because once water leakage occurs, it not only affects the structural durability, but also increases the cost of later sealing. Therefore, waterproofing for composite wall structure is a crucial and difficult aspect in metro station engineering construction, requiring targeted research. Method: The reasons for water leakage in diaphragm walls, inner linings and other critical locations of the composite walls are analyzed. Based on Changsha Metro Line 6 Chaoyangcun Station project, multiple waterproofing techniques in composite wall comprehensive waterproof system are introduced, including retaining structure waterproofing, waterproof coating, pretreatment of leakage points, inner lining waterproofing, and preembedded grouting pipe waterproofing. New technologies and devices used in the implementation of each waterproofing technique are presented, along with corresponding safeguard measures and precautions. Result & Conclusion: During the three years of usage after the completion of Changsha Metro Line 6 Chaoyangcun Station, no water leakage occurred, indicating that the proposed composite wall comprehensive waterproof system performs well.
论文检索