合肥地铁浅埋暗挖隧道施工对邻近管线的影响
裴子钰1周仕波2马明杰3,4杨新安3,4
Influence of Hefei Metro Shallow-buried Underground-excavated Tunnel Construction on Adjacent Pipelines
PEI ZiyuZHOU ShiboMA MingjieYANG Xin’an
-
作者信息:1.1.北京城建设计发展集团股份有限公司,100037,北京;
2.2.合肥市轨道交通集团有限公司,230001,合肥;
3.3.同济大学道路与交通工程教育部重点实验室,201804,上海;
4.4.同济大学交通运输工程学院,201804,上海
-
Affiliation:Beijing Urban Construction Design & Development Group Co., Ltd., 100037, Beijing, China
-
关键词:
-
Key words:
-
DOI:10.16037/j.1007-869x.2023.01.023
-
中图分类号/CLCN:U456.3
-
栏目/Col:研究报告
摘要:
以合肥地铁2号线浅埋暗挖隧道工程为研究背景,运用数值模拟和现场实测的方法,研究隧道开挖影响下埋地管线变形及受力问题。研究结果表明,管材、管径、管线所处地层、管隧间距及开挖工法是影响管线受力变形的主要因素。提出了施工时需要特别重视的工况及工况组合。
Abstracts:
With the shallow-buried underground-excavated tunnel project of Hefei Metro Line 2 as research background, adopting numerical simulation and field measurement methods, the influence of tunnel excavation on deformation and stress of buried pipelines is studied. Results show that pipe material, pipe diameter, pipeline level stratum, pipe-tunnel spacing and excavation method are the most significant factors affecting the stress and deformation of pipelines. In the end, the working conditions and the combination of working conditions that require special attention in construction are given.
- 上一篇: 高铁物流运输模式及其可行性
- 下一篇: 地铁隧道过海段复合衬砌参数的敏感性分析